Turn on more accessible mode
Skip to main content
Turn off more accessible mode
Transportation Final 10-15-11 -
2.2 - State Bridge Conditions
This Site: 2.2 - State Bridge Conditions
Transportation Final 10-15-11
1. Safety
2. Preservation
3. Mobility
4. Ferries
5. Stewardship
Action Plan
1.1 - Fatalities On All Washington Roads
1.1.a - Impaired Driving Fatalities and Serious Injuries
1.1.b - Run Off The Road Fatalities and Serious Injuries
1.1.c - Speed Related Fatalities and Serious Injuries
1.1.e - Fatalities and Serious Injuries on State Routes and Interstates
1.1.d - Young Drivers
2.1 - State Highway Pavement
2.2 - State Bridge Conditions
2.3 - Percent of targets met for state highway maintenance levels
3.1 - Before and After Results From Mobility Projects
3.2 - Average Time to Clear Major Incidents
3.3 - Commute Trips Reduced While Driving Alone
3.2.a - Enhanced Incident Response - Pilot
4.1 - State Ferries Ridership
4.2 - State Ferries Farebox Revenue
4.3 - State Ferries On-time Performance
5.1 - Percent of capital projects completed on-time and within budget
Transportation Final 10-15-11
>
2. Preservation
>
2.2 - State Bridge Conditions
>
ActionPlan
>
Replace bridges as programmed.
ActionPlan
: Replace bridges as programmed.
Title
Replace bridges as programmed.
Who
WSDOT Bridge Office
Agency
DOT
DueDate
6/30/2013
Status
In Progress
Description
TPA funded the rehabilitation or replacement of 20 bridges, including Hood Canal. To date, 5 bridges and the east-half of Hood Canal have been replaced, 2 bridges have been rehabilitated and 5 bridges are under contract. 25 additional bridges have been identified and prioritized using pre existing funds.
Purpose
ForumDate
2011-01-26
PriorityArea
Transportation
SecondaryAgency
StatusComment
As of June 30, 2011: TPA funded the rehabilitation or replacement of 26 bridges, including Hood Canal. To date, 10 bridges and the Hood Canal have been completed, 13 are scheduled to be completed or under construction in the 2011-13 biennium. Seven additional bridges included for replacement or rehabilitation this biennium are funded with pre-existing transportation funds.
StatusDate
9/28/2011
Attachments
Created at 10/18/2011 3:50 PM by mossadmin